DOTThis week the Iowa Department of Transportation (DOT) announced the start date for two bridge replacement projects on Highway 25 in Adair County. The projects are just south of Interstate-80 and will begin on Tuesday, May 29th, with a completion set for sometime this fall.

The first replacement is for an existing structure over the Middle River just north of 120th Street. The second is over North Turkey Creek just south of 150th Street. The highway will be closed from 110th-160th Streets for the duration of the project.

The DOT will be sending notifications about the projects to area residents. A public information meeting on the projects’ progress has also been scheduled for Thursday, September 6th from 4:30-6pm at the 5X80 Golf and Country Club in Menlo. To see a project display, including a proposed detour, click on the link below:

https://dehayf5mhw1h7.cloudfront.net/wp-content/uploads/sites/1074/2019/01/23115244/090616Iowa25AdairPD1.pdf